The construction of the Dutton started back in the fall of 2013 after the kit arrived in the summer. It was built over the winter with first test drives in the spring of 2014. The Vehicle was registered in July with first water trials late August (sink or swim). Some parts were designed, welded and made out of 304 stainless steel.